Douglas Elliman Real Estate · Cobb Miller Group941-373-5363 · 913-744-0248
Concession Bradenton
Chapter 03 · Homes and Design

Custom Home Builders and Architects Behind The Concession

Updated November 2026 · 10 minute read · 2,151 words
The short answer

Published sources tie several custom builders to The Concession, including John Cannon Homes, Anchor Builders, Arthur Rutenberg Homes, John Neal Homes, Lee Wetherington Homes and Stock Signature Homes. Builders must be on the community's approved list, and every plan goes through architectural review. No public source we found names the architects, so ask for them by address.

Iron-and-glass double front doors under an arched transom
Iron-and-glass double front doors under an arched transom

Most buyers in this price range ask who built a house before they ask about the pool. They have a reason. In a community where each home is drawn for its lot, the builder is the person who made hundreds of decisions you cannot see once the drywall is up: how the roof deck was fastened, where the plumbing runs, which windows went into which openings. This page lists the builders that published sources connect to The Concession, explains how custom building and approval work inside the gates, and describes what a buyer can learn by following a builder's paper trail. It does not rank anyone.

Which builders have built in The Concession?

There is no single official directory, so the list below comes from published news and promotional material, each tied to a date. Read it as a record of who has been present, not as a current roster.

BuilderWhat the sources saySource and date
John Cannon HomesBuilt the Victoria model (5,193 sq ft, 4 bedrooms, 4.5 baths) and The Avianna, a 2016 Parade of Homes award winner; built 8305 FaringtonPatch, February 2017; California Newswire, 2016; listing
Anchor BuildersBuilt The Marquesas model (5,105 sq ft, 4 bedrooms, 5 baths), described as a coastal design with West Indian influencesPatch, February 2017
Stock Signature HomesBuilt The Clairborne II model (4,369 sq ft, 3 bedrooms, 4.5 baths)Patch, February 2017
Arthur Rutenberg HomesNamed among builders of custom homes and modelsObserver report, early build-out era
John Neal HomesNamed among builders of custom homes and modelsObserver report, early build-out era
Lee Wetherington HomesNamed among builders of custom homes and modelsObserver report, early build-out era

Two cautions about that table. First, the Observer page carries a 2024 date stamp but its text speaks of homes expected to finish in spring 2014, so we treat it as reporting from about 2014. Second, a 2016 Nicklaus Design article lists several Parade of Homes award-winning builders, including some above and others such as Johnson Homes of Southwest Florida, but does not say which of them were building at The Concession, so we did not add the extras to the table.

What do we know about John Cannon Homes?

John Cannon Homes built the Farington Court estate that is the featured listing on this site, and the company names The Concession among its project locations. According to a sponsored Sarasota Magazine feature from November 2025, the company has built since 1987, is run by John Cannon with his wife and their two children, and has completed more than 2,500 private residences, including over 400 waterfront estates on barrier islands. Because that feature was produced in collaboration with the builder, treat the totals and the award counts as the company's own claims.

A 2016 announcement about The Avianna, a Cannon home at The Concession, reported that it won Best Overall and Best Architectural Detail at that year's Parade of Homes, presented by the Manatee-Sarasota Building Industry Association, and that Coast to Coast Pools won Best Pool Design for the pool. The same release put the size of Cannon's award-winning models at 2,800 to 5,000 square feet. None of this tells you how any one house has aged. It tells you where to start asking for records.

Large living room from the foyer, with columns and built-in niches
Large living room from the foyer, with columns and built-in niches

How does custom building actually work inside the gates?

The community's Design Standards Manual, dated October 5, 2015, lays out the sequence, and it is more structured than many buyers expect. The version we reviewed may have changed, so confirm the current rules with the review administrator.

  1. Builder eligibility. Builders must be on the review committee's approved builders list.
  2. Concept submittal. The builder or architect submits two sets with an application and a non-refundable fee: a site plan, a concept floor plan and four elevations. For a speculative client, no fee is due until a client contract is signed. For a client under contract with a builder, the fee is due at the concept stage.
  3. Concept response. The committee comments and the reviewed set returns to the builder or architect. The manual says owners must be kept informed of comments and design changes.
  4. Final submittal. A certified survey, final site plan, floor plans, elevations with labeled materials, a roof plan, and material specifications and samples, among other items. Drawings must carry an information block that includes the design professionals' contact details and Florida license numbers.
  5. County permit. Only after committee approval does the Manatee County building permit step come in the manual's own sequence.
  6. Construction, with a midpoint review. At about half completion, the owner submits the landscape plan and the committee reviews paint samples on two wall sections at a front corner.
  7. Final review and certificate of occupancy. The committee gets a week's notice for the final architectural and landscape review, and the county issues the certificate of occupancy.

The 2015 manual sets no turnaround time for the committee. It does say that if work pauses for more than six months, or the design changes substantially, a new application and fee are required, and if the review deposit runs out the owner replenishes half the original. For a buyer, the practical lesson is that timeline risk sits in review as well as in construction, so ask any builder to describe how long review has taken on recent submissions.

How are lots combined or adjusted?

The manual allows easements along shared boundaries to be realigned when lots are combined, but lots cannot be combined if infrastructure sits between them, and combining remains subject to the declaration and the committee's discretion. Variances to setbacks must be requested in writing and are granted only for hardships unique to the lot. If you are drawn to a lot because of a particular plan, confirm in writing what the committee will allow before you commit. The lot types and views page shows how position changes what can be built.

Who are the architects?

We could not find a public source naming the architects or designers behind homes in The Concession. The John Cannon Homes feature credits John Cannon with personally refining house plans and names no architect. The manual confirms that design professionals sign submissions with Florida license numbers, so the information exists in each house's file even though it is not published. Request the plan set or the first sheet of the permit drawings for any address you are serious about, and look for the design professional's name and license number on the title block.

What can a buyer learn from knowing the builder?

The name opens up four questions, and each can be answered with documents.

What was approved? The architectural approval file shows the concept and final submittals, any deviations granted, and the landscape approval. A house with a granted deviation is not a problem on its own. It becomes one if the deviation is undocumented.

What was permitted and inspected? Manatee County's Building Division runs permit applications, permit searches and inspection scheduling through its Accela Online Services portal. A permit search for the address shows the original permit, the certificate of occupancy and later permits for roofs, pools, screen enclosures, air conditioning and similar work. A gap, such as a screened lanai with no permit, is worth raising early. The renovations and architectural review page explains why.

Who held a license? The Florida Department of Business and Professional Regulation (DBPR) provides a Verify a License search by name or number. Under section 489.13 of the Florida Statutes, unlicensed contracting carries administrative fines of up to $10,000, and local building departments may not issue permits to unlicensed contractors. If a roof or pool was added by someone other than the original builder, check that contractor too.

What coverage is left? Florida shortened its statute of repose for construction defect claims to seven years in April 2023, counted from the earliest of a temporary occupancy permit, a final occupancy permit, a completion certificate or abandonment of the project. For a house completed in 2007, that window has long closed, which makes inspection and the roof and system records the real protection. For a newer home, ask the builder for written warranty terms and have an attorney read them. The new construction versus resale page covers how those trade-offs compare.

How should a buyer compare homes by different builders?

Without ranking anyone, a few neutral comparisons are possible:

  • Documentation. Which builder or seller can produce plans, selections, permits, inspection records and warranty paperwork, and how quickly.
  • Specification. Compare windows, roof assembly, air conditioning equipment and pool construction as listed, not as marketed. The luxury features guide shows what to ask about each.
  • Age and code. A house's permit date, not just its year built, tells you which Florida Building Code edition applied.
  • Service. Ask previous owners, through your agent, what happened when something needed attention after closing.
  • Independent inspection. A general inspection plus specialists for roof, pool, air conditioning and wind mitigation is standard practice for homes of this size. See luxury home inspections.

What is the difference between a custom build, a spec home and a builder's resale?

The manual itself distinguishes between a speculative client and a client under contract, which hints at the main categories buyers meet.

A custom build starts with a lot and a contract. The owner works with a builder, and often a separate designer, through concept and final submittals, and takes on the timing and decision load that comes with that. A speculative or inventory home is built by a builder before a buyer exists, and the buyer inherits selections that someone else made. A resale is a completed home whose first owner chose the plan and finishes, and which may have been altered since. Each has different paper: a custom buyer holds a contract and selections sheets, a spec buyer receives the builder's warranty terms, and a resale buyer gets whatever the seller kept plus whatever the county and the association hold.

For a house of the age of 8305 Farington, built in 2007, the records may sit with the original owner, the builder, the association and Manatee County. Ask the seller's side what exists and who holds it.

How does building time work?

Public sources do not give typical build durations for homes here, so we do not state one. Two facts do bear on timing. First, the committee's process is staged, with a concept review, a final review, a midpoint landscape and paint review and a final inspection, and the manual sets no review deadline. Second, Manatee County posted a notice that, under Florida House Bill 803, new single-family dwelling permits issued on or after July 1, 2026 expire one year after issuance or on the effective date of the next edition of the Florida Building Code, whichever is later, replacing the earlier 180-day period. The Building Commission is expected to issue guidance on extensions. Ask any builder how they plan around that expiration date, and ask the county what applies to your specific permit.

What should you ask a builder before signing?

  • Is the firm on the approved builders list today, and since when?
  • Who is the project superintendent, and who will be on site day to day?
  • What written warranty terms apply, and who services them?
  • How are allowances and change orders documented?
  • Which subcontractors handle the roof, windows, pool and air conditioning, and are they licensed in Florida?
  • What happened on the last two or three review submissions in the community, and how long did each take?
  • Can I speak with owners of homes the firm completed here at least five years ago?

Written answers are better than verbal ones, and an attorney who handles Florida construction contracts should read the agreement.

What does not carry over from one build to the next?

The manual says approved deviations do not set precedent, so a neighbor's approval is not yours. It also means a builder's showcase home may not be reproducible on your lot. Landscaping, lighting, paint colors, fences and pool enclosures each have their own approval step, and the committee can require extra landscaping. If a builder tells you that something "always gets approved," ask to see the approval in writing.

What this page leaves out

The builders above are those we could tie to a published source. Other firms may have built in the community, and some on the list may no longer take new work there. Nothing here is a recommendation. For a specific home, the builder's identity should come from the permit and approval records, not from a brochure.

Questions people ask

Who builds homes in The Concession?

Published sources name John Cannon Homes, Anchor Builders, Arthur Rutenberg Homes, John Neal Homes, Lee Wetherington Homes and Stock Signature Homes as builders of models or homes there, across different years. The list is not exhaustive or current, and builders must be on the architectural review committee's approved list, so confirm eligibility with the community for any builder you consider.

Can I bring my own builder to a Concession lot?

Only if that builder is on the committee's approved builders list. The 2015 design manual says builders must be on that list before plans are reviewed. The route to approval is not described publicly, so ask the review administrator how a builder is added, how long it takes and what the builder must submit.

Does the builder's name affect a home's value?

A builder's name tells you who to ask about plans, materials and service history, and it can matter to how a particular house is perceived. It is not a guarantee of condition. Condition is established by inspection and records, so treat the name as a starting point for questions and not as a substitute for an inspection.

Who designs the homes, the builder or an architect?

Both models exist in custom building: a builder may produce plans in house, or an owner may hire a design professional separately. The community's manual requires the design professionals' contact details and Florida license numbers on submissions. We found no public list of architects who have worked in The Concession, so request the plan set for a specific house.

How long is a builder responsible for defects in Florida?

Florida's statute of repose for construction defect claims is seven years since an April 2023 change, counted from the earliest of a temporary or final occupancy permit, a completion certificate, or abandonment. Contract warranties are separate and vary by builder. Have an attorney read any warranty and ask for the builder's written terms before closing on a newer home.

Sources checked

  1. Sarasota Magazine branded content: Rooted in Sarasota, John Cannon Homes (November 2025)
  2. Patch: Concession Residences announce grand opening of three new model homes (February 20, 2017)
  3. Your Observer: The Concession to build new homes
  4. Nicklaus Design: The Concession Residences wins Best Development award (April 2016)
  5. California Newswire: The Avianna at The Concession (2016)
  6. The Concession Design Standards Manual (October 5, 2015)
  7. Bradley: Florida Legislature aims to reduce construction claims (June 2023)
  8. Florida Statutes 489.13 (unlicensed contracting)
  9. Manatee County notice: Florida House Bill 803, new single-family permit expiration (June 30, 2026)
  10. Manatee County Building Division
Private tours

Want to see The Concession in person?

A private tour takes about an hour and covers the community, the lots and the homes that fit what you are looking for.

Request a tour →

Douglas Elliman Real Estate
Cobb Miller Group
Tara Miller and Katie Cobb